Chill Factor

Use arrows (if visible) to scroll additional images. Click an image to enlarge it.

Project Overview

Having completed all the indoor ski facilities in the UK and enjoying a successful trading history with Contractors Sir Robert McAlpine, we were invited to join the construction team early into the design process. The design team were a joy to work with and soon an effective scheme developed to on site installation.

Over 25,000m2 of insulated panels were installed to construct the sub zero temperature controlled environment for the production of real snow. We also incorporated bespoke alpine style timber frame curtain walling to provide the viewing galleries over the all the snow activities.

Key Benefits/Successes

  • Real collaboration with great people from design through to completion.
  • Use of our invaluable experience from previous schemes.
  • Involvement in an exciting high profile project.